Skip to content

Introduction to Software Engineering

SWE · Final · Spring 26

Paper 1 of 3By Mohammad Abidul Islam SafatSwitch

Paper 1 of 3

This browser can’t show the PDF here

Open it, and your phone’s PDF viewer takes it, or download it.

Read the questions as text

Read off the PDF by AI, so it may have mistakes. The PDF is the original.

Daffodil International University Department of Software Engineering Faculty of Science & Information Technology Semester Final Examination Spring 2026 Course Code: SE113; Course Title: Introduction to Software Engineering Sections & Teachers: IM (47-A), RM (47-B, 47-C, 47-D, 47-E), NML (47-F), FF (47-G) Duration: 2:00 Hours Full Marks: 40 Answer ALL Questions [The figures in the right margin indicate the full marks and corresponding course outcomes. All portions of each question must be answered sequentially.] 1. A company, TechNova Solutions, is developing an Online Healthcare Management System (OHMS) for multiple hospitals. The system includes modules for patient registration, appointment scheduling, electronic medical records, billing, and reporting. The team consists of developers, testers, and a project manager. During development, the team faces requirement changes, tight deadlines, and integration risks. a) Explain the phases of software project management in the context of the OHMS project. [Marks - 5] | CLO1 Level 2 b) Define software testing and explain its importance for this system. [Marks - 3] | c) The OHMS appointment scheduling system allows booking appointments between 1 and 30 days in advance. Explain how Boundary Value Analysis (BVA) can help in identifying important test cases at the limits of this input range. [Marks - 2] | 2. a) The project consists of the following tasks: Task | Duration (weeks) | Dependency A | 3 | - B | 4 | A C | 3 | A D | 5 | B E | 4 | B, C F | 3 | C G | 2 | D, E, F H | 4 | G Draw the task dependency diagram and demonstrate the critical path and total project duration. [Marks - 8] | CLO2 Level 3 b) [Figure: A directed acyclic graph showing nodes 1 through 7 with directed edges: 1->2, 2->3, 2->4, 3->5, 4->5, 5->6, 6->7] [Marks - 7] | Calculate the Cyclomatic Complexity using adjacency matrix and predicated nodes from the above Control Flow Graph (CFG). 3. a) Outline three risks in the OHMS project from Question 1 and discuss mitigation strategies for any one of them. [Marks - 5] | CLO3 Level 2 b) Explain any two appropriate software testing techniques with examples from the scenario described in Question 1. [Marks - 5] | c) Assume that the expected size of an organic software project is 43.1 KLOC. Using the coefficients in the table below and the Basic COCOMO model, calculate Effort, Development Time and Number of People required to complete the project. Project Class | ab | bb | cb | db [Marks - 5] | Organic | 2.4 | 1.05 | 2.5 | 0.38 | Semidetached | 3.0 | 1.12 | 2.5 | 0.38 | Embedded | 3.6 | 1.20 | 2.5 | 0.12 |