Engineering Materials
CE · Midterm · Spring 25
Read the questions as text
Read off the PDF by AI, so it may have mistakes. The PDF is the original.
Daffodil International University
B. Sc. in Civil Engineering
Mid Term Examination, Spring - 2025
Course Code: CE 201
Course Title: Engineering Materials
Section: BN1 & BN2
Level-Term: 2-1
Teacher's Initial: AU
Full Marks: 25
Date: March 11, 2025
Time: 1.5 Hours
Note: There are six questions in total. Answer all of them. Right hand margin indicates full marks.
1. The initial weight of a sample of powdered limestone is 430 grams, and the weight of the dried residue on filter paper is 110 grams. The residue after decantation and drying weighed 55 grams. Calculate the percentage of carbonate, sand, and clay present in the sample of limestone. [CO2, C3] [03]
2. Write down the uses of Mortar. [CO1, C1] [02]
3. Write short note on any four of the following: [CO1, C1] [08]
I. Bulking of Sand
II. Field Tests of Bricks
III. Hydration of Cement
IV. Harmful Constituents of Bricks
V. False Setting of Cement
VI. Slag Cement
4. For a bridge construction project, the recommended FM for sand is 2.5. From a nearby market, two sand samples (sand-1 and sand-2) were collected. The samples were sent to the Concrete Laboratory of Daffodil International University of Bangladesh for sieve analysis. The sieve analysis data are given.
Sieve Size (mm) | Materials Retained (gm) Sand-1 | Materials Retained (gm) Sand-2
25 | 20 | 23
16 | 22 | 38
4.75 | 17 | 31
2.36 | 56 | 20
1.19 | 48 | 25
0.59 | 15 | 13
0.4 | 50 | 20
0.15 | 10 | 10
0.075 | 42 | 40
Pan | 0 | 0
(I) Calculate FM of the sand samples.
(II) In what proportions, the sand samples are to be mixed to get the recommended FM?
(III) Comment on the samples based on the sieve analysis data. [CO2, C3] [07]
5. Illustrate the figure of rule pointing and cut pointing. [CO1, C2] [02]
6. Illustrate the flow chart of the wet process for the manufacturing of cement. [CO1, C2] [03]