Skip to content

Yarn Manufacturing II

TE · Midterm · Fall 25

This browser can’t show the PDF here

Open it, and your phone’s PDF viewer takes it, or download it.

Read the questions as text

Read off the PDF by AI, so it may have mistakes. The PDF is the original.

Form number: OBE/TE/Fall-2025 Daffodil International University Faculty of Engineering Department of Textile Engineering Program: B.Sc. in Textile Engineering Midterm Examination, Semester: Fall-2025 Course Code: 0723-225 Course Title: Yarn Manufacturing-II Credit Hours: 3.0 Total Marks: 25 Time: 1.5 hours. Name & Designation of the Examiner: Md. Mashud Raihan (MR), Assistant Professor Date and Time of the exam: 23.10.2025, 2:00 PM Answer all the questions 1. Answer any five (5) of the following Six (a to f) [CO-1, PO-2, C/L-2] 5x4 = 20 a) Relate the equation with increasing bobbin dia, bobbin speed will be decreases by mentioning their principles. b) Describe the purpose of using a roving frame before a ring frame and explain its importance with a suitable example. c) Summarize the recent developments in roving frame technology and explain their impact on the spinning process. d) Demonstrate the principles of Servo Motor Drives for Drafting Rollers, and Flyers Work in a Speed Frame e) Explain the working principle and procedure of Auto-Doffing System. f) Summarize material faults, their causes and corrective solutions for the simplex machine. 2. Answer the question [CO-4, PO-2, C/L-3] 5 a) Calculate the production in kg per day of 10 modern speed frame machines whose parameters are given below- Flyer speed 1160 rpm, no. of flyer 115, roving count 0.96 Ne, TM 1.3, and efficiency 94%.